STANDARD FULL SPECIFICATION 2 x AC1 Rated 4 Pole ABB Branded Contactors ( Mechanical & Electrically Interlocked) Compliance - BS EN 60947-1, Phase Failure/Phase Sequence Relay Line to Line, Set Of LED Indication Lamps, Auto/Test Switch (Optional), 10 Amp Auxiliary Output, Mains / Generator On Load Delay Timers, Mild Steel Enclosure IP65 RAL 7032, Two Wire Generator Start Signal - N/O Volt Free Contact, Mains-N/O Volt Free Contact, Generator-N/O Volt Free Contact,
Manufacturer part number: ABB416
Manufacturer: Blades Power Generation

Please State Labelling required

£457.63 incl tax

Mains to Generator Automatic Transfer Switch.

Automatic switching between Mains & Standby Generator

 

3 Phase + Neutral 4 Pole (400V) Automatic Transfer Switch Also Known As an ATS Panel.  

A phase failure relay is used for Mains voltage monitoring and offers Phase Failure & phase sequence Protection.

 

The Automatic Transfer Switch Control Panel has two-time control relays for on load delay.

1stTimer normally set to 10s and is used to control the Mains on load / Restoration period, this controls the period the Mains supply has to be healthy before engaging the Mains contactor.

The 2nd Timer normally set for 30s controls the generator settling period, this time period ensures the generator has run up to speed and has stabilized before any load is applied to the generator. 

On failure of the Mains supply, this initiates a volt free contact (N/O) start signal to the generator.

Upon the generator starting the 2nd timer will initiate, Then after this period, the generator will then go onto load.

The Automatic Transfer Switch will monitor the Mains, as soon as the mains is restored it will drop the generator contactor and initiates the 1st timer sequence, then switch automatically back to the Mains supply,

Once the load has returned to the Mains supply the generator start signal is removed and the generator will settle.   

 

Automatic Transfer Switch Full & Basic Specification Explained 

Phase Failure / Phase Sequence Relay (Standard)

Mains – Primary On Load Delay Timer, user adjustable 0.3 Sec & 30 hours. ( Removed for Basic Spec )

10 Amp Auxiliary Output Terminals for Battery charger or other ( Removed for Basic Spec )

Secondary - Generator Warm-Up Timer, user adjustable 0.3 Sec & 30 hours. (Standard)

Mains Auxiliary Contacts Terminals ( N/O Contact ) ( Removed for Basic Spec )

Generator Auxiliary Contact Terminals ( N/O Contact ) ( Removed for Basic Spec )

 

Mains Failure Simulation Switch ( Auto Test ) (Option)

This is a Mains Simulation Test Switch that you can simulate a mains failure from the switch on the panel door.

 

Dc Battery Charger

A D/c Battery Charger Will Be fitted into the panel to keep the generator battery at optimal starting voltage.

 

LED Indication Labels - Available & On Load Options

Mains / Generator, Primary / Secondary, Supply 1 / Supply 2

Any Other options available upon request

Example:

S1 Available ( Green  ) S1 On Load ( Red )

S2 Available ( Green  ) S2 On Load ( Yellow

 

Enclosure:

IP65 Mild Steel enclosure, Removable top & bottom gland plates

Single or Twin Door Lock system (This depends on cubical size)

Cable entry standard is arranged for bottom entry with a direct connection into the contactors

Specification to EN 62208, EN 60529, IK10, EN 61439-1-2.

 

Assembled in the UK by Blades Power Generation Limited using parts conforming to EN60529, EN60947.

Provided with a 12-month warranty ( extended warranty available)

 

Mains to Generator Automatic Transfer Switch.

Automatic switching between Mains & Standby Generator

 

3 Phase + Neutral 4 Pole (400V) Automatic Transfer Switch Also Known As an ATS Panel.  

A phase failure relay is used for Mains voltage monitoring and offers Phase Failure & phase sequence Protection.

 

The Automatic Transfer Switch Control Panel has two-time control relays for on load delay.

1stTimer normally set to 10s and is used to control the Mains on load / Restoration period, this controls the period the Mains supply has to be healthy before engaging the Mains contactor.

The 2nd Timer normally set for 30s controls the generator settling period, this time period ensures the generator has run up to speed and has stabilized before any load is applied to the generator. 

On failure of the Mains supply, this initiates a volt free contact (N/O) start signal to the generator.

Upon the generator starting the 2nd timer will initiate, Then after this period, the generator will then go onto load.

The Automatic Transfer Switch will monitor the Mains, as soon as the mains is restored it will drop the generator contactor and initiates the 1st timer sequence, then switch automatically back to the Mains supply,

Once the load has returned to the Mains supply the generator start signal is removed and the generator will settle.   

 

Automatic Transfer Switch Full & Basic Specification Explained 

Phase Failure / Phase Sequence Relay (Standard)

Mains – Primary On Load Delay Timer, user adjustable 0.3 Sec & 30 hours. ( Removed for Basic Spec )

10 Amp Auxiliary Output Terminals for Battery charger or other ( Removed for Basic Spec )

Secondary - Generator Warm-Up Timer, user adjustable 0.3 Sec & 30 hours. (Standard)

Mains Auxiliary Contacts Terminals ( N/O Contact ) ( Removed for Basic Spec )

Generator Auxiliary Contact Terminals ( N/O Contact ) ( Removed for Basic Spec )

 

Mains Failure Simulation Switch ( Auto Test ) (Option)

This is a Mains Simulation Test Switch that you can simulate a mains failure from the switch on the panel door.

 

Dc Battery Charger

A D/c Battery Charger Will Be fitted into the panel to keep the generator battery at optimal starting voltage.

 

LED Indication Labels - Available & On Load Options

Mains / Generator, Primary / Secondary, Supply 1 / Supply 2

Any Other options available upon request

Example:

S1 Available ( Green  ) S1 On Load ( Red )

S2 Available ( Green  ) S2 On Load ( Yellow

 

Enclosure:

IP65 Mild Steel enclosure, Removable top & bottom gland plates

Single or Twin Door Lock system (This depends on cubical size)

Cable entry standard is arranged for bottom entry with a direct connection into the contactors

Specification to EN 62208, EN 60529, IK10, EN 61439-1-2.

 

Assembled in the UK by Blades Power Generation Limited using parts conforming to EN60529, EN60947.

Provided with a 12-month warranty ( extended warranty available)

 

Products specifications
Component Manufacture ABB
Requirement Industrial 3 Phase + N 415v
Amp Rating 16 Amp
IP55 All Steel Enclosure 400 High 400 Wide 200 Deep
Products specifications
Component Manufacture ABB
Requirement Industrial 3 Phase + N 415v
Amp Rating 16 Amp
IP55 All Steel Enclosure 400 High 400 Wide 200 Deep